The Executive is the owner of the Supertram system. South Yorkshire Supertram Limited (SYSL) (a subsidiary of Stagecoach), operate the Supertram network, and maintain the majority of the asset for the Executive, under a Concession terminated in 2024. The wear of the embedded rails had reached a condition on certain lengths of the network where it required replacement to prevent the flange of the tram wheels running on the bottom of the rail groove. Accordingly between 2013 and 2015, approximately 15km of embedded rail was replaced. It is proposed to complete the remaining 10km of replacement over the summers of 2018 and 2019. The works comprise the replacement of the remaining sect…

Key details

Source
Contracts Finder
Lifecycle stage
Award
Status
active
CPV classification
45234116 — Track construction works
Currency
GBP
Total award value
£9,340,851
Tender value
£12,500,000
First published
26 Sept 2017
Last updated
23 Apr 2018
View the original notice

Awards

1 award recorded on this procurement.

SupplierCompanies HouseAwardedStatusValue
VOLKERRAIL LIMITED0318431318 Apr 2018active£9.3m

Notice timeline

Every published notice in this procurement's lifecycle.

  1. Tender noticeSupertram Embedded Rail Replacement Phase 2
  2. Tender amendmentSupertram Embedded Rail Replacement Phase 2
  3. Tender amendmentSupertram Embedded Rail Replacement Phase 2
  4. Award noticeSupertram Embedded Rail Replacement Phase 2

All suppliers

Frameworks & programmes

More from SOUTH YORKSHIRE PASSENGER TRANSPORT EXECUTIVE

FAQs about this procurement

Who is the buyer for "Supertram Embedded Rail Replacement Phase 2"?

Supertram Embedded Rail Replacement Phase 2 is a UK public-sector procurement published by SOUTH YORKSHIRE PASSENGER TRANSPORT EXECUTIVE via Contracts Finder.

Has "Supertram Embedded Rail Replacement Phase 2" been awarded?

Yes — 1 award is recorded, with a reported total value of £9,340,851. The current lifecycle stage is "Award".

Which suppliers are involved in "Supertram Embedded Rail Replacement Phase 2"?

1 supplier is linked: VOLKERRAIL LIMITED.

What is "Supertram Embedded Rail Replacement Phase 2" worth?

The reported award value is £9,340,851.

When was "Supertram Embedded Rail Replacement Phase 2" published?

It was first published on 26 Sept 2017 and last updated on 23 Apr 2018, across 4 notices.

Track procurements like this one

Enable monitors the entire UK public-contract pipeline — get alerts on buyers, suppliers and frameworks that matter to you.

Get in touch with Enable