Supertram Embedded Rail Replacement Phase 2

Part of Supertram Embedded Rail Replacement Phase 2.

Contracts Finder

The Executive is the owner of the Supertram system. South Yorkshire Supertram Limited (SYSL) (a subsidiary of Stagecoach), operate the Supertram network, and maintain the majority of the asset for the Executive, under a Concession terminated in 2024. The wear of the embedded rails had reached a condition on certain lengths of the network where it required replacement to prevent the flange of the tram wheels running on the bottom of the rail groove. Accordingly between 2013 and 2015, approximately 15km of embedded rail was replaced. It is proposed to complete the remaining 10km of replac…

Published
17 Nov 2017
Status
active
CPV
45234116 — Track construction works
Tender period
— – 8 Dec 2017
View the original notice

Other notices in this procurement

FAQs about this notice

What type of notice is this?

This is a tender amendment published via Contracts Finder on 17 Nov 2017.

Which procurement does this notice belong to?

It is part of "Supertram Embedded Rail Replacement Phase 2", published by SOUTH YORKSHIRE PASSENGER TRANSPORT EXECUTIVE.

Get the full procurement picture

Enable turns the UK's public-contract data into pipeline intelligence for bid and capture teams. Talk to us about access, alerts and tailored market analysis.

Get in touch with Enable