Contracts Finder · Award

Smart Meter Load Control Device Trial

A public procurement published by Business Energy and Industrial Strategy via Contracts Finder.

Contracts FinderAward
£246.3k
Award value
£3.2m
Tender value
5
Suppliers
5
Awards
6
Notices
Award
Stage

Overview

This is a two stage SBRI. In Phase 1, BEIS will fund up to 5 feasibility studies to scope the design and trial of a smart meter load control device, including giving detail on what functionality will be tested and in what context. Phase 2 will involve selecting and contracting with up to 2 of the above studies/consortia who will each design, build, test, commercially product assure (CPA) and trial the devices, at a scale of around 100 homes, based on existing HCALCS specifications as described above. HCALCS are specified in Smart Energy Code (SMETS - Schedule 9) and there is existing functionality built into Data Communications Company (DCC) systems to support these devices, but to date…

Key details

Source
Contracts Finder
Lifecycle stage
Award
Status
active
CPV classification
09300000 — Electricity, heating, solar and nuclear energy
Currency
GBP
Total award value
£246,263
Tender value
£3,200,000
First published
12 Nov 2018
Last updated
8 Mar 2019
View the original notice

Awards

5 awards recorded on this procurement.

SupplierCompanies HouseAwardedStatusValue
Utilisoft Ltd4 Jan 2019active£50k
OCTOPUS ENERGY LIMITED092634244 Jan 2019active£50k
EDF Energy R&D, Itron, Nuvve and SMETS Design Limited4 Jan 2019active£49.9k
DuckDuck Ltd, Gemserve Ltd, GenGame Ltd, Green Energy UK PLC4 Jan 2019active£49.1k
EDMI Europe Limited078103304 Jan 2019active£47.3k

Notice timeline

Every published notice in this procurement's lifecycle.

  1. Tender noticeSmart Meter Load Control Device Trial
  2. Tender amendmentSmart Meter Load Control Device Trial
  3. Tender amendmentSmart Meter Load Control Device Trial
  4. Tender amendmentSmart Meter Load Control Device Trial
  5. Tender amendmentSmart Meter Load Control Device Trial
  6. Award noticeSmart Meter Load Control Device Trial

All suppliers

Frameworks & programmes

More from Business Energy and Industrial Strategy

FAQs about this procurement

Who is the buyer for "Smart Meter Load Control Device Trial"?

Smart Meter Load Control Device Trial is a UK public-sector procurement published by Business Energy and Industrial Strategy via Contracts Finder.

Has "Smart Meter Load Control Device Trial" been awarded?

Yes — 5 awards are recorded, with a reported total value of £246,263. The current lifecycle stage is "Award".

Which suppliers are involved in "Smart Meter Load Control Device Trial"?

5 suppliers are linked: Utilisoft Ltd, OCTOPUS ENERGY LIMITED, EDF Energy R&D, Itron, Nuvve and SMETS Design Limited, DuckDuck Ltd, Gemserve Ltd, GenGame Ltd, Green Energy UK PLC, EDMI Europe Limited.

What is "Smart Meter Load Control Device Trial" worth?

The reported award value is £246,263.

When was "Smart Meter Load Control Device Trial" published?

It was first published on 12 Nov 2018 and last updated on 8 Mar 2019, across 6 notices.

Track procurements like this one

Enable monitors the entire UK public-contract pipeline — get alerts on buyers, suppliers and frameworks that matter to you.

Get in touch with Enable