Contracts Finder · Award
Smart Meter Load Control Device Trial
A public procurement published by Business Energy and Industrial Strategy via Contracts Finder.
- £246.3k
- Award value
- £3.2m
- Tender value
- 5
- Suppliers
- 5
- Awards
- 6
- Notices
- Award
- Stage
Overview
This is a two stage SBRI. In Phase 1, BEIS will fund up to 5 feasibility studies to scope the design and trial of a smart meter load control device, including giving detail on what functionality will be tested and in what context. Phase 2 will involve selecting and contracting with up to 2 of the above studies/consortia who will each design, build, test, commercially product assure (CPA) and trial the devices, at a scale of around 100 homes, based on existing HCALCS specifications as described above. HCALCS are specified in Smart Energy Code (SMETS - Schedule 9) and there is existing functionality built into Data Communications Company (DCC) systems to support these devices, but to date…
Key details
- Source
- Contracts Finder
- Lifecycle stage
- Award
- Status
- active
- CPV classification
- 09300000 — Electricity, heating, solar and nuclear energy
- Currency
- GBP
- Total award value
- £246,263
- Tender value
- £3,200,000
- First published
- 12 Nov 2018
- Last updated
- 8 Mar 2019
Awards
5 awards recorded on this procurement.
| Supplier | Companies House | Awarded | Status | Value |
|---|---|---|---|---|
| Utilisoft Ltd | — | 4 Jan 2019 | active | £50k |
| OCTOPUS ENERGY LIMITED | 09263424 | 4 Jan 2019 | active | £50k |
| EDF Energy R&D, Itron, Nuvve and SMETS Design Limited | — | 4 Jan 2019 | active | £49.9k |
| DuckDuck Ltd, Gemserve Ltd, GenGame Ltd, Green Energy UK PLC | — | 4 Jan 2019 | active | £49.1k |
| EDMI Europe Limited | 07810330 | 4 Jan 2019 | active | £47.3k |
Notice timeline
Every published notice in this procurement's lifecycle.
- Tender noticeSmart Meter Load Control Device Trial
- Tender amendmentSmart Meter Load Control Device Trial
- Tender amendmentSmart Meter Load Control Device Trial
- Tender amendmentSmart Meter Load Control Device Trial
- Tender amendmentSmart Meter Load Control Device Trial
- Award noticeSmart Meter Load Control Device Trial
All suppliers
Frameworks & programmes
More from Business Energy and Industrial Strategy
FAQs about this procurement
Who is the buyer for "Smart Meter Load Control Device Trial"?
Smart Meter Load Control Device Trial is a UK public-sector procurement published by Business Energy and Industrial Strategy via Contracts Finder.
Has "Smart Meter Load Control Device Trial" been awarded?
Yes — 5 awards are recorded, with a reported total value of £246,263. The current lifecycle stage is "Award".
Which suppliers are involved in "Smart Meter Load Control Device Trial"?
5 suppliers are linked: Utilisoft Ltd, OCTOPUS ENERGY LIMITED, EDF Energy R&D, Itron, Nuvve and SMETS Design Limited, DuckDuck Ltd, Gemserve Ltd, GenGame Ltd, Green Energy UK PLC, EDMI Europe Limited.
What is "Smart Meter Load Control Device Trial" worth?
The reported award value is £246,263.
When was "Smart Meter Load Control Device Trial" published?
It was first published on 12 Nov 2018 and last updated on 8 Mar 2019, across 6 notices.
Track procurements like this one
Enable monitors the entire UK public-contract pipeline — get alerts on buyers, suppliers and frameworks that matter to you.
Get in touch with Enable