Award notice · Contracts Finder

Smart Meter Load Control Device Trial

Part of Smart Meter Load Control Device Trial.

Contracts Finder

This is a two stage SBRI. In Phase 1, BEIS will fund up to 5 feasibility studies to scope the design and trial of a smart meter load control device, including giving detail on what functionality will be tested and in what context. Phase 2 will involve selecting and contracting with up to 2 of the above studies/consortia who will each design, build, test, commercially product assure (CPA) and trial the devices, at a scale of around 100 homes, based on existing HCALCS specifications as described above. HCALCS are specified in Smart Energy Code (SMETS - Schedule 9) and there is existing func…

Published
8 Mar 2019
Status
complete
CPV
09300000 — Electricity, heating, solar and nuclear energy
Tender period
— – 10 Dec 2018
View the original notice

Awards

Other notices in this procurement

FAQs about this notice

What type of notice is this?

This is a award notice published via Contracts Finder on 8 Mar 2019.

Which procurement does this notice belong to?

It is part of "Smart Meter Load Control Device Trial", published by Business Energy and Industrial Strategy.

Has this notice resulted in an award?

5 awards are recorded on this notice, including to Utilisoft Ltd.

Get the full procurement picture

Enable turns the UK's public-contract data into pipeline intelligence for bid and capture teams. Talk to us about access, alerts and tailored market analysis.

Get in touch with Enable