Buckbarrow Bridge Replacement

A public procurement published by Cumberland Council via Contracts Finder.

Contracts FinderAward
£370.7k
Award value
£470k
Tender value
1
Suppliers
1
Awards
1
Notices
Award
Stage

Overview

The existing Buckbarrow Bridge is a two-span structure with the superstructure consisting of two equal spans of 8.75m. The bridge carried the U4064 County Road over Buckbarrow Beck (Non-main river). A load assessment of the bridge was carried out in May 2022, which identified significant failings in the original load assessment which was undertaken in 2000. Following this, an Interim Measures Feasibility report was produced which identified the need for a 3-tonne weight limit and a fortnightly inspection regime. During the course of these fortnightly inspections the deterioration of the bridge began to accelerate, and a decision was made to close the bridge on August 30th, 2023, to safeguar…

Key details

Source
Contracts Finder
Lifecycle stage
Award
Status
complete
CPV classification
45000000 — Construction work
Currency
GBP
Total award value
£370,659
Tender value
£470,000
First published
21 Aug 2024
Last updated
21 Aug 2024
View the original notice

Awards

1 award recorded on this procurement.

SupplierCompanies HouseAwardedStatusValue
Cubby Construction Ltd0264112019 Aug 2024active£370.7k

Notice timeline

Every published notice in this procurement's lifecycle.

  1. Award noticeBuckbarrow Bridge Replacement

All suppliers

Frameworks & programmes

More from Cumberland Council

FAQs about this procurement

Who is the buyer for "Buckbarrow Bridge Replacement"?

Buckbarrow Bridge Replacement is a UK public-sector procurement published by Cumberland Council via Contracts Finder.

Has "Buckbarrow Bridge Replacement" been awarded?

Yes — 1 award is recorded, with a reported total value of £370,659. The current lifecycle stage is "Award".

Which suppliers are involved in "Buckbarrow Bridge Replacement"?

1 supplier is linked: Cubby Construction Ltd.

What is "Buckbarrow Bridge Replacement" worth?

The reported award value is £370,659.

When was "Buckbarrow Bridge Replacement" published?

It was first published on 21 Aug 2024 and last updated on 21 Aug 2024, across 1 notice.

Track procurements like this one

Enable monitors the entire UK public-contract pipeline — get alerts on buyers, suppliers and frameworks that matter to you.

Get in touch with Enable