Buckbarrow Bridge Replacement

Part of Buckbarrow Bridge Replacement.

Contracts Finder

The existing Buckbarrow Bridge is a two-span structure with the superstructure consisting of two equal spans of 8.75m. The bridge carried the U4064 County Road over Buckbarrow Beck (Non-main river). A load assessment of the bridge was carried out in May 2022, which identified significant failings in the original load assessment which was undertaken in 2000. Following this, an Interim Measures Feasibility report was produced which identified the need for a 3-tonne weight limit and a fortnightly inspection regime. During the course of these fortnightly inspections the deterioration of the bridg…

Published
21 Aug 2024
Status
complete
CPV
45000000 — Construction work
Tender period
— – 21 Jun 2024
View the original notice

Awards

Other notices in this procurement

This is the only notice on record.

FAQs about this notice

What type of notice is this?

This is a award notice published via Contracts Finder on 21 Aug 2024.

Which procurement does this notice belong to?

It is part of "Buckbarrow Bridge Replacement", published by Cumberland Council.

Has this notice resulted in an award?

1 award is recorded on this notice, including to Cubby Construction Ltd.