Tender notice · Contracts Finder

New Cut Canal Bridge Refurbishment

Part of New Cut Canal Bridge Refurbishment.

Contracts Finder

New Cut Canal Bridge carries the A642 over the Calder and Hebble Navigation in Horbury Bridge. The bridge is a single span masonry arch with reinforced concrete arch extension to the west side. The reinforced concrete arch was constructed in 1925 using the "Hennebique" system and was strengthened with a post tensioned reinforced concrete saddle in 1992. The refurbishment works to comprise: - • Masonry Section: comprising Arch intrados, east elevation (spandrels, parapet), north east and south east wing walls. Raking out and repointing localised areas of loose and friable morta…

Published
23 Aug 2019
Status
active
CPV
45221000 — Construction work for bridges and tunnels, shafts and subways
Tender period
— – 16 Sept 2019
View the original notice

Other notices in this procurement

This is the only notice on record.

FAQs about this notice

What type of notice is this?

This is a tender notice published via Contracts Finder on 23 Aug 2019.

Which procurement does this notice belong to?

It is part of "New Cut Canal Bridge Refurbishment", published by Wakefield Council.

Get the full procurement picture

Enable turns the UK's public-contract data into pipeline intelligence for bid and capture teams. Talk to us about access, alerts and tailored market analysis.

Get in touch with Enable