TED · Unknown
RMCB 025 — Dynamic Purchasing System for Building Construction, Design and Build Construction, Demountable (Temporary) Buildings, Asbestos Removal and Demolition
A public procurement published by Shropshire Council via TED.
TEDUnknown
- —
- Award value
- £625m
- Tender value
- 0
- Suppliers
- 0
- Awards
- 1
- Notices
- Unknown
- Stage
Key details
- Buyer
- Shropshire Council
- Source
- TED
- Lifecycle stage
- Unknown
- Status
- —
- CPV classification
- 45210000
- Currency
- GBP
- Total award value
- —
- Tender value
- £625,000,000
- First published
- 9 Aug 2019
- Last updated
- 9 Aug 2019
Notice timeline
Every published notice in this procurement's lifecycle.
Frameworks & programmes
More from Shropshire Council
PMCV 017 — Inpatient Medically Assisted Withdrawal Beds
Tender · TEDDMCV 012 — Office Furniture Removals
Award · TEDRMCV 033 — Asbestos Consultancy
Award · TEDAMCV 293 — Carers Support Service
Tender · TEDDMNH 023 — SITP VMS Deployment Scheme
Tender · TEDPMCV 017 — Inpatient Medically Assisted Withdrawal Beds
Award · TEDFAQs about this procurement
Who is the buyer for "RMCB 025 — Dynamic Purchasing System for Building Construction, Design and Build Construction, Demountable (Temporary) Buildings, Asbestos Removal and Demolition"?
RMCB 025 — Dynamic Purchasing System for Building Construction, Design and Build Construction, Demountable (Temporary) Buildings, Asbestos Removal and Demolition is a UK public-sector procurement published by Shropshire Council via TED.
Has "RMCB 025 — Dynamic Purchasing System for Building Construction, Design and Build Construction, Demountable (Temporary) Buildings, Asbestos Removal and Demolition" been awarded?
No award has been recorded yet. The current lifecycle stage is "Unknown".
What is "RMCB 025 — Dynamic Purchasing System for Building Construction, Design and Build Construction, Demountable (Temporary) Buildings, Asbestos Removal and Demolition" worth?
The reported tender value is £625,000,000.
When was "RMCB 025 — Dynamic Purchasing System for Building Construction, Design and Build Construction, Demountable (Temporary) Buildings, Asbestos Removal and Demolition" published?
It was first published on 9 Aug 2019 and last updated on 9 Aug 2019, across 1 notice.
Track procurements like this one
Enable monitors the entire UK public-contract pipeline — get alerts on buyers, suppliers and frameworks that matter to you.
Get in touch with Enable