Public Contracts Scotland · Contract
NEC3 Clyde Bridge Replacement Project
A public procurement published by South Lanarkshire Council via Public Contracts Scotland.
- —
- Award value
- —
- Tender value
- 1
- Suppliers
- 1
- Awards
- 1
- Notices
- Contract
- Stage
Overview
South Lanarkshire Council are proceeding with the construction of a 90-metre single span proprietary steel bridge to replace the existing reinforced concrete bridge structure, subject to the Council acquiring the land required for the project as set out below. The proposed structure includes a 4.2m wide carriageway with an additional footway of minimum width 1.05m. The new structure will be constructed off-line of the existing bridge. The proposed carriageway on approach to the structure will follow a new alignment and will include new approach roads to the north and south which will tie into the existing C29 Pettinain Road. The proprietary bridge will be supported on reinforced concrete…
Key details
- Source
- Public Contracts Scotland
- Lifecycle stage
- Contract
- Status
- complete
- CPV classification
- 45000000
- Currency
- GBP
- Total award value
- —
- Tender value
- —
- First published
- 14 Nov 2022
- Last updated
- 14 Nov 2022
Awards
1 award recorded on this procurement.
| Supplier | Companies House | Awarded | Status | Value |
|---|---|---|---|---|
| Terrence Higgins Trust | 01778149 | — | — | — |
Notice timeline
Every published notice in this procurement's lifecycle.
All suppliers
Frameworks & programmes
More from South Lanarkshire Council
FAQs about this procurement
Who is the buyer for "NEC3 Clyde Bridge Replacement Project"?
NEC3 Clyde Bridge Replacement Project is a UK public-sector procurement published by South Lanarkshire Council via Public Contracts Scotland.
Has "NEC3 Clyde Bridge Replacement Project" been awarded?
Yes — 1 award is recorded. The current lifecycle stage is "Contract".
Which suppliers are involved in "NEC3 Clyde Bridge Replacement Project"?
1 supplier is linked: Terrence Higgins Trust.
When was "NEC3 Clyde Bridge Replacement Project" published?
It was first published on 14 Nov 2022 and last updated on 14 Nov 2022, across 1 notice.
Track procurements like this one
Enable monitors the entire UK public-contract pipeline — get alerts on buyers, suppliers and frameworks that matter to you.
Get in touch with Enable