YNE-CDF-Castle Mills Eel Pass-OBC Design
Part of YNE-CDF-Castle Mills Eel Pass-OBC Design.
The Castle Mills Sluice is located on the River Foss, in the Foss Basin in York city centre. Optioneering took place earlier in 2023, to narrow down a preferred option to replace the original (no longer in-situ) eel pass. A preferred option has been selected as an outcome of this process and detailed design is required to enable its construction in summer 2024.
- Procurement
- YNE-CDF-Castle Mills Eel Pass-OBC Design
- Buyer
- Environment Agency
- Published
- 26 Mar 2024
- Status
- complete
- CPV
- 45246000 — River regulation and flood control works
- Tender period
- — – 12 Mar 2024
Awards
Other notices in this procurement
This is the only notice on record.
FAQs about this notice
What type of notice is this?
This is a award notice published via Contracts Finder on 26 Mar 2024.
Which procurement does this notice belong to?
It is part of "YNE-CDF-Castle Mills Eel Pass-OBC Design", published by Environment Agency.
Has this notice resulted in an award?
1 award is recorded on this notice, including to Ove Arup & Partners Limited.