Stanbridge Lane Bridge Refurbishment
Part of Stanbridge Lane Bridge Refurbishment.
W55 Standbridge Lane Bridge carries A6186 over Owler Beck in Sandal. The original bridge constructed in 1853 comprises a reinforced concrete deck slab built on stonework abutments. The bridge was widened in 1983 with a reinforced concrete deck slab supported on reinforced concrete abutments. Directly adjacent to the south elevation of the bridge is W2033 Standbridge Lane Footbridge that carries a footpath over Owler Beck. The footbridge has single span simply supported steel vierendeel girders that are carried on concrete bankseats. The refurbishment works to the bridge and footbri…
- Procurement
- Stanbridge Lane Bridge Refurbishment
- Buyer
- Wakefield Council
- Published
- 23 Aug 2019
- Status
- active
- CPV
- 45221000 — Construction work for bridges and tunnels, shafts and subways
- Tender period
- — – 16 Sept 2019
Other notices in this procurement
FAQs about this notice
What type of notice is this?
This is a tender notice published via Contracts Finder on 23 Aug 2019.
Which procurement does this notice belong to?
It is part of "Stanbridge Lane Bridge Refurbishment", published by Wakefield Council.
Get the full procurement picture
Enable turns the UK's public-contract data into pipeline intelligence for bid and capture teams. Talk to us about access, alerts and tailored market analysis.
Get in touch with Enable