Tender update · Find a Tender
Smart Metering Supply, Installation & Connectivity Services
Part of Developer Services & Metering.
United Utilities (UU) have committed to the rollout of more than 900,000 Smart AMI meters during AMP 8 as a key enabler to reduce water supply volumes (via reductions in per capita consumption (“PCC”), reductions in customer-side leakage (“CSL”) and non-household (“NHH”) demand). In order to achieve this UU intend to appoint a single prime contractor to deliver the full scope of services (Smart Meter supply, meter installation and connectivity services/comms), whether directly or through sub-contract arrangements, for the 5 year AMP 8 period, with extension options up to the end of AMP 9.
- Procurement
- Developer Services & Metering
- Published
- 21 Dec 2023
- Status
- —
- CPV
- 50411100 — Repair and maintenance services of water meters
- Tender period
- —
Other notices in this procurement
- Developer Services & MeteringPlanning notice · 19 Dec 2022
- Smart Metering Supply, Installation & Connectivity ServicesTender notice · 19 Dec 2023
- Developer Services & Lead ReplacementTender notice · 31 Jan 2024
- Developer Services & Lead ReplacementAward,contract · 14 Jan 2025
- Smart Metering Supply, Installation & Connectivity ServicesAward,contract · 17 Jan 2025
FAQs about this notice
What type of notice is this?
This is a tender update published via Find a Tender on 21 Dec 2023.
Which procurement does this notice belong to?
It is part of "Developer Services & Metering", published by United Utilities Water Limited.
Get the full procurement picture
Enable turns the UK's public-contract data into pipeline intelligence for bid and capture teams. Talk to us about access, alerts and tailored market analysis.
Get in touch with Enable