Award notice · Contracts Finder
Smart Meter Load Control Device Trial
Part of Smart Meter Load Control Device Trial.
This is a two stage SBRI. In Phase 1, BEIS will fund up to 5 feasibility studies to scope the design and trial of a smart meter load control device, including giving detail on what functionality will be tested and in what context. Phase 2 will involve selecting and contracting with up to 2 of the above studies/consortia who will each design, build, test, commercially product assure (CPA) and trial the devices, at a scale of around 100 homes, based on existing HCALCS specifications as described above. HCALCS are specified in Smart Energy Code (SMETS - Schedule 9) and there is existing func…
- Procurement
- Smart Meter Load Control Device Trial
- Published
- 17 May 2019
- Status
- complete
- CPV
- 09300000 — Electricity, heating, solar and nuclear energy
- Tender period
- — – 10 Dec 2018
Awards
Other notices in this procurement
This is the only notice on record.
FAQs about this notice
What type of notice is this?
This is a award notice published via Contracts Finder on 17 May 2019.
Which procurement does this notice belong to?
It is part of "Smart Meter Load Control Device Trial", published by Business Energy and Industrial Strategy.
Has this notice resulted in an award?
2 awards are recorded on this notice, including to EDF Energy R&D, Itron, Nuvve and SMETS Design Limited.
Get the full procurement picture
Enable turns the UK's public-contract data into pipeline intelligence for bid and capture teams. Talk to us about access, alerts and tailored market analysis.
Get in touch with Enable