1. Production of a prioritised survey schedule 2. Production of survey specifications in accordance with the schedule produced in stage 1 The first stage has resulted in a report (70045694-30-REP-0008) that gave a recommended priority for surveys. This proposal is based on the surveys proposed in that report. The specifications produced will define - The scope of the survey - The level of the survey: visual, measurement etc (recognising that intrusive surveys may not be appropriate at this point in the project within operational buildings) - Information that already exists - The…
- Procurement
- SCAH Survey Work
- Published
- 28 Jan 2020
- Status
- complete
- CPV
- 45000000 — Construction work
- Tender period
- — – 7 Oct 2019
Awards
Other notices in this procurement
This is the only notice on record.
FAQs about this notice
What type of notice is this?
This is a award notice published via Contracts Finder on 28 Jan 2020.
Which procurement does this notice belong to?
It is part of "SCAH Survey Work", published by Defra Network eTendering Portal.
Has this notice resulted in an award?
1 award is recorded on this notice, including to WSP.
Get the full procurement picture
Enable turns the UK's public-contract data into pipeline intelligence for bid and capture teams. Talk to us about access, alerts and tailored market analysis.
Get in touch with Enable