Award notice · Contracts Finder
Rapid Engineering Model v2
Part of Rapid Engineering Model v2.
The key aims of the Rapid Engineering Modelling Ver 2 ( to SGAR3/5) is to deliver greater and more efficient project level designs through: - Highways England taking greater control of standardised modular design development - Combined Driven/Drone based Surveying to create an accurate Digital Terrain Map Based asset platform - Rules Based Approach to Design Development derived from the principles demonstrated through the Ops Concept works - Reduction in the level of bespoke design resulting in increased costs due to varied design solutions in construction - Increased safety through gre…
- Procurement
- Rapid Engineering Model v2
- Buyer
- Highways England
- Published
- 16 Jul 2018
- Status
- complete
- CPV
- 71320000 — Engineering design services
- Tender period
- — – 27 Jun 2018
Awards
Other notices in this procurement
This is the only notice on record.
FAQs about this notice
What type of notice is this?
This is a award notice published via Contracts Finder on 16 Jul 2018.
Which procurement does this notice belong to?
It is part of "Rapid Engineering Model v2", published by Highways England.
Has this notice resulted in an award?
1 award is recorded on this notice, including to Bryden Wood.
Get the full procurement picture
Enable turns the UK's public-contract data into pipeline intelligence for bid and capture teams. Talk to us about access, alerts and tailored market analysis.
Get in touch with Enable