Tender notice · Contracts Finder

PHE - Corporate - Chilton Boiler System Replacement

Part of PHE - Corporate - Chilton Boiler System Replacement.

Contracts Finder

Removal of the existing heating boilers, flues, insulation, control and isolation valves, and redundant pipework. As well, as the provision and installation of new heating boilers, flues, circulation pumps, pipework, dirt/air header, distribution pipework, gas, insulation, control and isolating valves, modified control panel and associated equipment to be installed in the boiler-room at Public Health England, Chilton. Address: Public Health England, Harwell Campus, Didcot, Oxford, OX11 0RQ. Additional information: If not already done so, you will need to register your organisation on…

Published
9 Apr 2019
Status
active
CPV
42160000 — Boiler installations
Tender period
— – 3 May 2019
View the original notice

Other notices in this procurement

This is the only notice on record.

FAQs about this notice

What type of notice is this?

This is a tender notice published via Contracts Finder on 9 Apr 2019.

Which procurement does this notice belong to?

It is part of "PHE - Corporate - Chilton Boiler System Replacement", published by Public Health England.

Get the full procurement picture

Enable turns the UK's public-contract data into pipeline intelligence for bid and capture teams. Talk to us about access, alerts and tailored market analysis.

Get in touch with Enable