Tender notice · Find a Tender

NEC3 Clyde Bridge Replacement Project

Part of Clyde Bridge Replacement Project.

Find a Tender

South Lanarkshire Council are proceeding with the construction of a 90-metre single span proprietary steel bridge to replace the existing reinforced concrete bridge structure, subject to the Council acquiring the land required for the project as set out below. The proposed structure includes a 4.2m wide carriageway with an additional footway of minimum width 1.05m. The new structure will be constructed off-line of the existing bridge. The proposed carriageway on approach to the structure will follow a new alignment and will include new approach roads to the north and south which will tie into…

Published
19 Apr 2022
Status
active
CPV
45000000 — Construction work
Tender period
— – 19 May 2022
View the original notice

Other notices in this procurement

FAQs about this notice

What type of notice is this?

This is a tender notice published via Find a Tender on 19 Apr 2022.

Which procurement does this notice belong to?

It is part of "Clyde Bridge Replacement Project", published by South Lanarkshire Council.

Get the full procurement picture

Enable turns the UK's public-contract data into pipeline intelligence for bid and capture teams. Talk to us about access, alerts and tailored market analysis.

Get in touch with Enable