Tender notice · Public Contracts Scotland
Naver Bridge Replacement (Stage 1)
Part of Naver Bridge Replacement (Stage 1).
Public Contracts Scotland
Construction of new 3 span bridge constructed of composite prestressed beams with in-situ concrete deck and associated approach roads. Overall Bridge Span 66.45m within an overall scheme length of 461m including layby, retaining walls and junction improvements. Demolition and removal of existing bridge.
- Procurement
- Naver Bridge Replacement (Stage 1)
- Buyer
- Tayside Contracts
- Published
- 6 Feb 2023
- Status
- active
- CPV
- 45000000
- Tender period
- — – 10 Mar 2023
Other notices in this procurement
This is the only notice on record.
FAQs about this notice
What type of notice is this?
This is a tender notice published via Public Contracts Scotland on 6 Feb 2023.
Which procurement does this notice belong to?
It is part of "Naver Bridge Replacement (Stage 1)", published by Tayside Contracts.
Get the full procurement picture
Enable turns the UK's public-contract data into pipeline intelligence for bid and capture teams. Talk to us about access, alerts and tailored market analysis.
Get in touch with Enable