The current Fuel Line located in National Nuclear Laboratory's (NNL's) Central Laboratory was designed and installed in the mid-2000's in Area 400 to provide research and development (R&D) support to Sellafield Mixed Oxide (MOx) Plant (SMP), which utilised the Short Binderless Route (SBR) for producing MOx. However, the Fuel Line was never fully commissioned and has remained in a state of Care and Maintenance (C&M) since then. The intent is to re-purpose the above existing fuel line, whilst keeping certain elements embedded within the design. The scope of the works required is therefore to De…
- Procurement
- MOx Fuel Line
- Published
- 8 Jul 2024
- Status
- complete
- CPV
- 45351000 — Mechanical engineering installation works
- Tender period
- —
Awards
Other notices in this procurement
FAQs about this notice
What type of notice is this?
This is a award,contract published via Find a Tender on 8 Jul 2024.
Which procurement does this notice belong to?
It is part of "MOx Fuel Line", published by NATIONAL NUCLEAR LABORATORY LIMITED.
Has this notice resulted in an award?
1 award is recorded on this notice, including to Orano Limited.
Get the full procurement picture
Enable turns the UK's public-contract data into pipeline intelligence for bid and capture teams. Talk to us about access, alerts and tailored market analysis.
Get in touch with Enable