Via East Midlands Limited Ltd is seeking to appoint 1 supplier to provide bridge painting works. The works shall consist of the preparation and repainting of Fulwood Bridge on the A38 in Sutton in Ashfield, Nottingham. The bridge is a twin deck structure with the section to be painted being the three span steel lattice girder bridge on the north side. Spans to the bridge consist of two side spans measuring 13.3m and a central span of 17.1m. 4x no. lattice girders present connected via cross bracing and supporting a steel trough deck which also requires painting. Lattice girders supported on…
- Procurement
- Fulwood Bridge Painting
- Published
- 16 Apr 2026
- Status
- active
- CPV
- —
- Tender period
- — – 11 May 2026
Other notices in this procurement
This is the only notice on record.
FAQs about this notice
What type of notice is this?
This is a tender notice published via Find a Tender on 16 Apr 2026.
Which procurement does this notice belong to?
It is part of "Fulwood Bridge Painting", published by VIA EAST MIDLANDS LIMITED.
Get the full procurement picture
Enable turns the UK's public-contract data into pipeline intelligence for bid and capture teams. Talk to us about access, alerts and tailored market analysis.
Get in touch with Enable