Award notice · Contracts Finder

Cwmystwyth Planning and Design

Part of Cwmystwyth Planning and Design.

Contracts Finder

The principle, long term objective of the Cwmystwyth project is the reduction of metal loadings entering the Afon Ystwyth from the Cwmystwyth site. The proposed works aim to significantly reduce (by up to 50% immediately downstream) concentrations / loadings of dissolved lead and zinc in the Ystwyth, as well as a significant (but currently unquantifiable) reduction in the amount of fine grained, metal rich sediment newly entering the main river system through erosion of exposed spoil and in channel deposits at Cwmystwyth (and associated dissolved phase contamination from leaching). The works…

Published
20 Jan 2026
Status
complete
CPV
71356400 — Technical planning services
Tender period
— – 22 Apr 2025
View the original notice

Awards

Other notices in this procurement

This is the only notice on record.

FAQs about this notice

What type of notice is this?

This is a award notice published via Contracts Finder on 20 Jan 2026.

Which procurement does this notice belong to?

It is part of "Cwmystwyth Planning and Design", published by The Coal Authority.

Has this notice resulted in an award?

1 award is recorded on this notice, including to Jeremy Benn Associates Limited (T/A JBA Consulting).

Get the full procurement picture

Enable turns the UK's public-contract data into pipeline intelligence for bid and capture teams. Talk to us about access, alerts and tailored market analysis.

Get in touch with Enable