Condensate Water Pipework System - Quantity Surveyor
Part of Condensate Water Pipework System - Quantity Surveyor.
The project entails the replacement of existing Condenser Water pipework system with new. This pipework runs from the Ground to the 30th floor of Guy’s Tower. The project will need to be undertaken in two phases to ensure that cooling is available to the site at all times to the Hospital. The existing Condenser Water pipework provides the heat rejection for the existing Daikin Applied centrifugal chillers consisting of two 1.7 MW packaged centrifugal chillers reference 1A/1B (System 1) and one 3.4 MW packaged centrifugal chiller reference 2 (System 2) located within the Ground floor plantroom…
- Published
- 25 Sept 2025
- Status
- complete
- CPV
- —
- Tender period
- —
Awards
Other notices in this procurement
This is the only notice on record.
FAQs about this notice
What type of notice is this?
This is a award,contract published via Find a Tender on 25 Sept 2025.
Which procurement does this notice belong to?
It is part of "Condensate Water Pipework System - Quantity Surveyor", published by Guy's and St Thomas' NHS Foundation Trust.
Has this notice resulted in an award?
1 award is recorded on this notice, including to Oander.